This high profile project called for the design and construction of a 6,500 sqm building with nearly 200 car parks within a tight time frame of 6 months.

We undertook full design from concept to construction plans, including the resource consent process, site contamination investigation and construction of a rainwater harvesting system. We used the following general construction systems:

Structural steel
Precast concrete panels
Suspended concrete floor slabs
Coloursteel cladding

This project was delivered in 2011 on time and within budget.

Testimonial

“…the fact that Riggs designed and engineered this building meant any changes could be sorted without hold up or expensive over runs. The people skills that both Chris and Bryce have allow them to organise and achieve time lines with other contractors on site. Along with their knowledge of the building code it made this project enjoyable for all concerned.”
MR Slight, REMAP Ltd T/A Director Mitre 10 MEGA Mastertron